GE 227 MW Turbine, H/P and I/P Outer Cases
b
ECRS has was first contacted regarding this turbine in 1979. It was at this time that the original repairs were performed on the upper and lower, H/P and I/P cases. Because of the high operating pressure and temperature of these turbines, our repair material has a finite fatigue life. Because of this, the repairs need to be refurbished every 3-4 years. Work was performed on this particular unit during the 1979, 1981, 1984, 1991, and 1996 outages. The pictures that follow are of work performed during the 2001 outage. On the left is the existing repair, and on the right is after the refurbishing.
repair complete GE 250 MW Turbine, Upper and Lower I/P Outer Cases survey of damages repair procedures performed
repair complete
|
|||||||
|
|
|||||||||
|
|
Notice:This site and the drawings, designs, ideas, specifications, and information contained herein are the property of ECRS. Neither these images nor, the ideas, information, and knowhow contained within may be used or reproduced without the expressed written permission of ECRS. All authorized reproductions in whole or in part shall bear this notice. |
||||||||